Warm hands job, Tech need to be on site. To performed some activities.
We will require below materials for the activity.
1. He should have necessary tool kit for replacement of Supvisor Engine on Cisco switch C6509-E.
2. Laptop with TFTP server, Console drivers, Internet connectivity, terminal application ( Putty), WebEx client in it.
3. Console cables ( DB9 and USB both if DB9 doesnt work along with necessary drivers, LAN cables.