Design me a Product
₹750-1250 INR / hora
In Transformer Manufacturing Company also cycle time is a major issue. Hence in this project work is carried out to reduce the cycle time using the lean manufacturing concept. First past data is collected and the timing of each process is obtained. Based on the data processes are identified consuming maximum time and hence contributing maximum to the total cycle time. In this project fixture design and automation approach is used to reduce the cycle time
Nº del proyecto: #8159547
Sobre el proyecto
7 freelancers están ofertando un promedio de ₹956 / hora por este trabajo
Dear I am a professional for CAD/CAM /CAEwho have many experiences for the 3D modeling/rendering and the 2D drawing using Solidworks and AutoCAD and mechanical analysis with ANSYS and ABAQUS. I am sure to finish th Más
I have 9 years exp. in design and development field of SPM Machine, Automobile Assembly, Sheet metal ,Tubing, Tools, Jigs, Fixtures design. work with Solidworks, Ansys, Pro-e, Creo 3.0 and autocad. (3d modeling, De Más