Integrated Building Project Development - BIM Revit MEP model -- 2

Cerrado Publicado hace 2 años Pagado a la entrega
Cerrado Pagado a la entrega

We will provide the architectural model and details, you will deliver

BIM outputs

-Building services design

-Engineering and energy analysis

It includes

a) Fresh and flushing water supplies shall be provided to all sanitary fitments and draw-off points of the building. Separate water meters should be provided for water supply to kitchen and kitchen exhaust air washing systems. A ∅100mm fresh water incoming main (un-metered) and a ∅80mm flushing water incoming main are extended from Phase I to Phase II. They are suspended at the underside of the footbridge connecting Phase I and II. Sewage and rainwater disposal systems shall be provided to convey the foul water and rainwater from the site to the external drainage provisions as shown in Figure 3. Relevant water treatment device should be provided for the kitchen waste water according to statutory requirements prior to connection to the main sewer.

b) Air-conditioning and/or ventilation systems shall be provided to create comfort environments to different areas of the building according to their functions. Air- conditioning and ventilation systems complying to statutory requirements should also be provided for the kitchen area.

c) Electrical supply should be provided to support the functions of the buildings. While public power should be provided for public areas, tenant power should also be provided for kitchen and other tenant areas. Also, emergency power supply should be designed to provide essential power to support relevant fire services installations and other systems required to be operated in emergency situation. A 3-phase-4-wire LV (380V) armored cable extended from Phase I to Phase II is provided at the underside of the footbridge connecting Phase I and II.

d) Fire services installation shall be provided according to local statutory requirements. A ∅150mm fire services water incoming main extending from Phase I to Phase II is provided. It is suspended at the underside of the footbridge connecting Phase I and II. The design of building services systems should be presented by layouts, conceptual schematic diagrams and the BIM model. The design should include utilities’ connections from the provisions to the building services systems, the locations and sizes of the major plant rooms, the positions of the major equipment inside the plant rooms and also the major pipes and ducts distributed from the plants rooms to different areas. Detail design of building services systems inside rooms is not required except main restaurant. For the main restaurant, detail coordination between different building services installations is required. It should also be well coordinated with structural (i.e. beams, slabs and other structural details) and architectural details (i.e. ceiling design, pipe ducts and other architectural details). It shall be presented in BIM model. The building services systems shall equip with smart and green features. The financial and technical aspects of the proposed features should be investigated. Also, conceptual schematic diagrams should be prepared to illustrate the implementations of the features into the building services systems. The building energy efficiency shall be optimized with energy analysis properties in the BIM model, such as occupancy, condition, space type, zoning, etc.

Urgent work and message me if interested, more detailed information will be sent to you.

Building Information Modeling Autodesk Revit Architectural Engineering Arquitectura Canalización

Nº del proyecto: #32176009

Sobre el proyecto

8 propuestas Proyecto remoto Activo hace 2 años

8 freelancers están ofertando un promedio de $2825 por este trabajo

liveexperts123

Hi there,I'm biddin on your project "Integrated Building Project Development - BIM Revit MEP model -- 2"Architectural Engineering, Building Information Modeling, Building Architecture, Piping and Autodesk Revit We will Más

$2000 HKD en 4 días
(2 comentarios)
4.5
azraazeen9

Hello, i am ready exited to work you as i read your job description Integrated Building Project Development - BIM Revit MEP model I am also an expert in making 2d,3d modelling and animating characters 2dautocad drawing Más

$1600 HKD en 7 días
(7 comentarios)
3.8
tmAmeen

Hi I'm a BIM Expert I have good good team for revit (Architectural, Strectural and MEP) I can show you my previous works Fro more details please contact me Thanks and Regards Ameen TM Technical Head WaftureSolutions

$1600 HKD en 7 días
(7 comentarios)
3.4
aliganjei

Hi, I'm a professional BIM Manager and I'm experienced in field of BIM Modeling . Please check my profile to see my past work samples. I have a team and we can finish your project ASAP. sincerely yours.

$2000 HKD en 7 días
(1 comentario)
2.5
mahmoudralizadeh

Hello. I read your text carefully. If you send me architectural and structural drawings, I can suggest about the time of completion and its price. Things you need, including facilities, plumbing, etc., will be done wit Más

$2000 HKD en 20 días
(3 comentarios)
2.9
ISKARTORRES94

It will be the best because i have enough experience working with Revit. I would like to work in your project.

$1600 HKD en 7 días
(0 comentarios)
0.0
cadservicescoin

Hi, We can provide the complete MEP design in Revit LOD 300 level. We are well experienced in MEP design and calculation for the projects in USA, INDIA, KSA, UAE, OMAN, QATAR. Please consider, if our portfolio matches Más

$10000 HKD en 14 días
(0 comentarios)
0.0
UtpalC1960

I have expertise in planning and design of power supply system. I have worked for a reputed company for last 38 years. I have designed projects valued upto Rs. 6 billion in India and abroad.

$1800 HKD en 7 días
(0 comentarios)
0.0