URGENT for the next few hours - Assist with Project Management schedule diagram
$10-20 USD
Terminado
Publicado hace alrededor de 8 años
$10-20 USD
Pagado a la entrega
I need to sequence the activities of the project (attached) in the order. Those activities need to be completed before another activity can start (dependency). For example, when building a house, one cannot install the roof structure before the walls have been erected. Not all of the activities in your project can occur at the same time, and I’ll be looking at your sequence to see if you’ve taken a realistic approach in sequencing your activities. Please create a precedence diagram (as shown in example Exhibit 7.6) that shows the sequence of your activities.
Estimate the duration of your activities (tasks). Each of the tasks you defined from WBS attached.
Use the enumeration method (section 7-8b) to identify all the paths through your network, including identifying the critical path. Update the precedence diagram you created previously to show:
1. the duration for each activity in your diagram,
2. a list of all the paths and total duration of each path,
3. which of the paths is the critical path.
When you have finished updating your precedence diagram, it should have the same characteristics / look as Exhibit 7.15
I can deliver your project on MS PROJECT.
A professional Project Management tool
My research field is on Business Process Automation, so I have great experience and hability in modeling executable processes and WBS structuring.
$66 USD en 2 días
0,0 (1 comentario)
1,6
1,6
4 freelancers están ofertando un promedio de $48 USD por este trabajo
Hello!
I work as an infrastructure design engineer for a reputable consultant in the Middle East. I have already studied project management and used it during my work.
Your task is simple, we just need to order the given activities and assume a suitable duration for each activity. Drawing the precedence diagram and determining the critical path would be very simple.
I am connected to the internet 24 hours daily so contacting me would not be a problem at all.
I am ready to deliver the required task in time with the best quality and the minimal cost.
Looking forward to discuss more details about your job as soon as possible.