ADMINISTRATION SYSTEM FOR VERY SMALL COMPUTER BUSINESS
$30-60 USD
Cerrado
Publicado hace casi 19 años
$30-60 USD
Pagado a la entrega
the system must be created in acces database. The work will carry out for this project as centred on producing a database system for this computer shop. To produce the system various stages in access design methodology will be attempted and completed leading to the production of the finished system. The Database system is purely designed to ease the time and work involved with the day-to-day administration of the company, which is predominantly carried out by the company secretary and staff. The production of the database system is necessary because the system currently in place and used by the company secretary and staff are completely manual. The manual nature of the system means that it is inefficient, time consuming and open to error. A new, improved and computer based system will benefit the user in terms of limiting the amount of work and time required in the production of necessary documents. In addition to this the requirement for manual calculations to be performed is removed and is carried out by the system itself. Task Plan Task 1. Research into database and how they Have developed overtime. 2. Look at Model of the Current System. 3. Context Level Dataflow Diagram. 4. Level 1 Dataflow Diagram. 5. Limitations of the existing system. 6. Crown IT Solutions. 7. Project Planning and Estimating the Work Load. 8. SOFTWARE DEVELOPMENT. 9. Database Specification. 10. The Entity Model. 11. Physical Data Store Entity Cross Reference. 12. Table Requirements. 13. Normalisation. 14. 3NF Determinacy Diagram. 15. Logical Data Store Entity Cross Reference. 16. Logical Dataflow Diagram - Context Level. 17. Logical Level 1 Dataflow Diagram. 18. Coding. 19. RESULTS / DISCUSSIONS. 20. Test Data. 21. EVALUATION.
## Deliverables
The deliverable for this project is to have a complete database design and enough of the database itself programmed and functioning to prove that the idea itself is feasible, and the design is largely correct. A complete report is also required illustrating all interviews, ideas, designs, test results, problems and conclusions that the hundred and ninety hours of work set aside for this project has produced.
## Platform
win xp