Bill of Materials (BOM) Evaluation Jobs

BOM evaluation includes evaluating a Bill of Materials for sourcing and pricing of parts.

Contratar a Component Engineers

Filtro

Mis búsquedas recientes
Filtrar por:
Presupuesto
a
a
a
Tipo
Habilidades
Idiomas
    Estado del trabajo
    1 trabajados encontrados, precios en EUR
    Themplite#1 -- 2 3 días left
    VERIFICADO

    I need a shcematic and bom list of a torch lighter that can be set at a certain temperature and the lighter will increase or decrease keeping the smoking apperatise (pipe) at that temperature. it needs to be ready to manufacture a working proto type.

    €1673 (Avg Bid)
    €1673 Oferta promedio
    8 ofertas